Structure: Load-bearing frame made of 2 mm cold-bent galvanized sheet profiles, welded and painted.
Dimensions: 8 x 3 x 2.5 m (length / width / height)
Exterior walls: Sandwich panel with polyurethane foam, manufactured by Topanel Romania, interior/exterior RAL 9002 white, PUR, sheet thickness 0.3/0.3 mm, wall thickness 80 mm.
Roof: lifting hooks for handling, roof system with a slight two way slope, made of galvanized sheet, thickness 0.4 mm. Roof sheet support system made of painted rectangular profiles 2 mm. Ceiling made of sandwich panel with polyurethane foam, produced by Topanel Romania, interior and exterior RAL 9002 white, PUR, sheet thickness 0.3 mm and 0.3 mm, panel thickness 80 mm.
Floor – from exterior to interior:
– corrugated painted sheet 0.25 mm,
– floor support system consisting of 8–16 crossbeams made of cold-bent C-profile galvanized sheet, 2 mm,
– basalt wool insulation 100 mm,
– anti-condensation membrane 120 g/sqm,
– TEGO panel 18/20 mm, load capacity 400 kg/sqm for interiors,
– Tarkett domestic medium-traffic linoleum, glued, with skirting boards and corner trims
PVC Joinery:
1 piece exterior PVC door with frame and sash, 5 point locking system, aluminum threshold, 3 hinges, panel type, 950×2050 mm. 1 piece interior door for the sanitary unit, 800×2000 mm. 2 pieces PVC windows with frame and sash, tilt and turn, 1200×1000 mm. 1 piece PVC tilt and turn window for the sanitary unit, 500×500 mm.
Sanitary unit:
sink, wall tiles, mounted mirror, toilet bowl with tank, corner shower with 3 or 4 walls, electric boiler
complete supply and drainage installation for connection to the cold water network and the sewage network. External connection of the container to these two networks is entirely the responsibility of the beneficiary.
INSTALATIE ELECTRICA:
Electrical installation components: exterior 230v outlet, interior panel equipped and wired, 4 positions, 2 LED lighting units 10w, 1 double surface mounted switch, 2 double surface mounted sockets.
INTERIOR FURNITURE:
7 locker units with 3 tall doors each, total 21 compartments, or 7 locker units with 6 short doors each, total 42 compartments
3 locker room benches, 1500 mm each
The beneficiary provides the placement platform for the structure at their own expense. Transport: charged according to destination Production time: 60 days from order or advance payment confirmation.
